June 18
Fit-out
Fit-out
Unused since the 1990s and untouched since the 1970s, this Port of Liverpool building has undergone a dramatic transformation.
Working with a £500,000 budget, TJM Projects delivered a complete refurbishment on behalf of AB Ports — turning a long-dormant space into a bright, modern office environment ready for the future.
Scope of Works Included:
- Full damp treatment
- Lining and insulating existing walls
- New flooring throughout
- Full internal decoration
- Suspended ceilings
- Complete electrical rewire
- New plumbing installation
- Full furniture supply and installation
The result? A once-forgotten space, now a fully operational and inviting workspace — a perfect example of breathing life back into historic infrastructure.














